Aim Of the Proejct:- Drought relieve and enhance the standered of living of peoples in project area through peoples participation.
Project Objectives:-
- Capacity building of farmers for effective Water management
- To increase the ground water level by effective water Management.
Major Project Components :-
- Water Conservation Works
- Capacity Building Trainings.
Project area:-
Two villages were selected for this water conservation project i.e.
1. Kachner and 2) Khodegaon
These two villages are situated on Aurangabad – Beed road around 40 K.M. away from Aurangabad city, at northern side of SambhajiSuger Factory. The Village Kachner is a well known spiritual place of Jainreligion. With due consideration to the domestic or potable water need and Agriculture water requirement, of targeted region, GraimvikasSanstha implemented the project in coordination with AFARM and Bajaj.
Work Completed during the year and till time so far under this Project
Sr.No |
Interventions |
Bajaj CSR Project |
Other Dept |
Total |
|
|
|
|
|
|
|
(Figures in Bracket are for Current Year) |
(Figures in Bracket are for Current Year) |
(Figures, in Bracket are for Current Year) |
01 |
CNB |
|
|
|
02 |
Farm Pond |
|
|
|
03 |
Deepening and Widening work |
70657
(36657)
|
41.94
(20.41)
|
|
|
|
|
|
|
|
|
Project Outcome:-
- Irrigated 50 hector agricultural land in both Kharip and Rabbi Season.
- Increased ground water level in the range of 2 to 3 Meters.
- Increase in agriculture income by 50 %
- Employment to landless villagers
Notable impact:-
- Spontaneous people’s participation
- Special contribution by the local people for de-silting of percolation tank.
On the Occasion Bajaj CSR Jalsandharan Project Inauguration HorDr.PurushatumBhapkar ( Div. Commissioner) C.P. Tripathi (Bajaj) SubashTaboli (Afarm) NarhariShivpure (GVS) & other Dignities
CSR Project Impact jalsamrudhi at khodegaon